KnitFine

From Approved Sample to Bulk Delivery

We use your approved sample and recorded specifications to guide cashmere production, with checks during manufacturing, packing, and shipment preparation.

Workers handling knit garments at workstations in a production workshop.

Your Order in Four Stages

Once you approve the sample and specifications, we produce and inspect your order, confirm packing with you, and arrange delivery.

1. Production Reference

Confirm the approved sample, final specifications, and order requirements.

2. Production and Checks

Knitting, linking, washing, and finishing follow the approved reference with in-process checks.

3. Packing Preparation

Products are checked, folded, labelled, and packed according to the agreed requirements.

4. Shipping and Delivery

Confirm the destination, transport service, and shipment documents before dispatch.

Six Steps from Approval to Shipment

Each stage uses the agreed specifications and the checks relevant to your cashmere product.

1. Confirm the Production Reference

Your approved sample and its material, component, and production records provide the reference for bulk manufacturing.

  • Approved sample
    Use the confirmed sample as the reference for the garment or accessory.
  • Materials and specifications
    Record the yarn, colors, measurements, construction, and brand details used for the sample.
  • Final order requirements
    Confirm the order specifications and packing requirements before bulk production begins.

2. Prepare Materials and Check Inputs

We check incoming yarn and accessories before they move into production.

  • Yarn checks
    Check yarn characteristics, color differences, twist, and moisture against the material requirements.
  • Trims and labels
    Check accessory specifications, colors, and quantities for the order.
  • Production preparation
    Prepare the yarn and the knitting work from the confirmed product requirements.

3. Produce to the Approved Reference

Our internal process brings together knitting, panel checking and repair, linking, washing, ironing, and finishing.

  • Knitting and panel checks
    Check knitting density, garment weight, and pattern accuracy; inspect and repair panels before linking.
  • Linking and finishing
    Check stitching and key garment dimensions, then review the hand feel and shrinkage after washing.
  • Production photos and videos
    We can share photos and videos with your team for your order; the content and timing are agreed for the project.

4. Inspect Products and Record Results

Our quality checks cover incoming materials, production, and finished products. In-process inspection reports can be provided for your order.

  • Appearance and workmanship
    Check for holes, dropped stitches, color differences, stains, and loose threads.
  • Garment measurements
    Check relevant dimensions such as chest, body length, sleeve length, shoulder width, and hem against the specifications.
  • Labels and quantity
    Check hangtags, care labels, packaging, and order counts during final inspection.

5. Pack and Prepare for Dispatch

We fold, tag, bag, and carton the finished products according to your confirmed packing requirements.

  • Individual protection
    Individual bags and acid-free tissue are available for protecting folded garments and accessories.
  • Branded presentation
    Gift boxes and brand packaging are available for retail or gifting requirements; confirm the actual packing specifications.
  • Cartons and documents
    Confirm carton marks, barcodes, quantities, and packing lists for the shipment.

6. Arrange Transport and Delivery

We arrange delivery to your door from Hangzhou. The references below run from dispatch to your door and are separate from production. Confirm destination coverage, the route, and customs responsibilities before booking. We prepare export documents such as packing lists, invoices, and bills of lading as applicable.

  • Courier — 5–9 days
    Usually 5–9 days from dispatch to your door, useful for urgent parcels and smaller orders. Confirm destination coverage and the courier service before booking.
  • Sea — about 30 days
    About 30 days from dispatch to your door as a planning reference, useful for larger orders where freight cost matters. Confirm the sailing route and door-delivery arrangement.
  • Air Delivery — about 15 days
    About 15 days from dispatch to your door as a planning reference, useful for orders with a shorter delivery schedule. Confirm the route and door-delivery service.
  • Rail — about 35 days
    About 35 days from dispatch to your door on available rail routes. This is another planning option for suitable destinations; rail service is not available for every country.

Updates for Your Order

Stay informed from production to dispatch. We agree on the content and timing of updates with you.

Production Photos

Review photos of your products during manufacturing to see how your order is progressing.

Process Videos

See selected production operations in videos shared with your team.

Inspection & Shipping

Receive available inspection information and the documents prepared for your shipment.

Plan Your Cashmere Production

Share the approved product, quantity, packing requirements, and destination. As a guide, bulk production takes 25–45 days, or 40–55 days for coats. Shipping time is separate.

Discuss Production and Delivery
Approved sample
Production reference
Photos and videos
Project updates
Confirmed route
Delivery plan

Cashmere Production and Delivery FAQs

Answers about sample consistency, order updates, quality checks, packaging, and delivery.

We use your approved sample and recorded materials, components, and specifications as the production reference. Incoming material, in-process, and finished-product checks cover the relevant yarn, construction, measurements, and brand details.
Yes. We can share photos and videos of your cashmere order during production. We agree with you on the stages shown, content, and update timing for the project.
We check yarn and accessories on arrival, knitting density and patterns during production, and stitching, measurements, and finishing. Final checks cover appearance, labels, packaging, and quantities. Panels are inspected and repaired before linking; detailed inspection criteria are confirmed for your order.
Available options include individual bags, acid-free tissue, gift boxes, and custom brand packaging. We confirm the presentation, carton marks, barcodes, and quantities for your order before shipment.
Bulk production planning references are 25–45 days, or 40–55 days for coats, depending on the product, quantity, and construction. Shipping time is additional. From dispatch in Hangzhou to your door, references are usually 5–9 days by courier, about 30 days by sea, about 15 days by air delivery, and about 35 days by rail on available routes. We confirm destination coverage, route, service details, and customs responsibilities before booking.
WhatsApp Chat with us